Installation and Training UK within 200 miles radius of London per site per server
Customers Responsibilities

1. Provide mains power socket within 3 metres of product location. UPS Recommended.

2. Connection points for telephones, lines, radios, microphones, ISDN trunks to be available within 3 metre of the products location. (We can provide additional cabling and patch panels & leads at additional cost)

2. Provide network connection point RJ45 Socket within 3 meters of the products location
(Only required if remote PC access is required on a network)

3. Provide a static IP address. (Only required if remote PC access is required on a network)

5. Customers Network / IT specialist to be on site to configure network settings

8. Administrator / Operators. Be available for training directly after installation completion
allow 2 hours same day.

Please ensure that these requirements are adhered to, this will ensure a predictable and successful installation to allow users to be speedily up and running.